Contact

Emerald Ash Borer Update

Post Date:02/18/2022 5:08 PM
If you have an Ash tree along the street in front of your home, it is being treated by the City Forestry Department to maintain its resistance to infestation by the Emerald Ash Borer (EAB). All City Ash trees lining the streets and in the parks have been treated or removed. If you have an Ash tree on your own property, you are responsible for treatment or its removal. If you are not already treating your Ash tree, it is very important that you have it removed as soon as possible by a qualified arborist. Infested trees are an extreme hazard to your home and those living there. Please see https://p.widencdn.net/rrokxh/Emerald-ash-borer--the-dangers-and-costs-of-infested-trees for more information.
Return to full list >>

Engineering

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Mission Statement

The Engineering Division is responsible for the design and construction of public improvement projects including:  street reconstruction and resurfacing, watermain replacement, sanitary sewer replacement and rehabilitation, stormwater system improvements, flood control, pollution prevention, green infrastructure, lighting improvements, parking lot improvements, maintenance of the City’s breakwater and lighthouse, park construction, harbor walk construction, marina improvements, and sidewalk and bike path improvements.   This Division builds and maintains City infrastructure records through its GIS system, seeks funding through grant writing, supports other department needs, guiding, overseeing, and inspecting all new development.

Programs/Service Lines

Provide ongoing inspection and maintenance of all City infrastructure including:

  • Street/Highways
  • Sidewalks and Trails
  • Water Main
  • Storm Sewers and Storm Water Management
  • Street Lighting
  • Marina
  • Breakwater
  • Waterways
Lead City Initiatives to Enhance the Built Environment:
  • Park Improvements (e.g., Park creation and development; building construction including restrooms, picnic shelters, fish cleaning station, etc.)
  • Municipal Building Upkeep and Construction (e.g., Fire Station, Municipal Garage, City Hall, etc.)

Guide Sustainable Development

Strategic Plan - Key Performance Indicators (KPI's)

  • Create standard specifications for construction.
  • Inspect all stormwater BMP's.
  • Develop an infiltration/inflow program in coordination with the Wastewater Treatment Plant Superintendent. 
2025 CTH LL Utility Extension
2025 Street Improvements Project
North Beach and Bluff Rehabilitation
Port Moves - Bicycle and Pedestrian Plan
Sidewalk Improvement Plan
Storm Water Management
WisDOT ADA Ramp Project
10 Year Street Project Plan
2024 Achievements
2025 Goals